MOT Type 1 Calculator

MOT Type 1 sub-base for patios, paths and driveways: tonnes for your area and depth, and how many 25 kg or 850 kg bulk bags to order.

MOT Type 1 is the standard sub-base in the UK: crushed stone or recycled concrete graded from about 40 mm down to dust, made to the Highways specification. The fines fill the gaps so it compacts into a hard, load-bearing layer under patios, paths, driveways and shed bases. Merchants sell it in 25 kg bags, 850 kg bulk bags and loose by the tonne. Type 1 compacts considerably, so this calculator adds 20% to the finished volume by default. Enter the area and the compacted depth and it gives the tonnes and m³, and the bags or bulk bags. As a guide, a tonne covers about 4.5 m² at 100 mm compacted.

Units
Bag sizes
Area
m
m
mm
t/m³
%
Compacts to roughly 2.1 tonnes per m³, which the 20% extra allows for.
Weight
2.59 tonnes

2,592 kg · 2.86 US tons

Volume
1.44 m³

1,440 L · 1.88 yd³

Bags
104

25 kg bag

Bags needed by size
25 kg bag104
850 kg bulk bag4
How it was worked out
  1. Area: 4 m × 3 m = 12 m²; × 100 mm (0.1 m) deep = 1.2 m³
  2. Plus 20% extra = 1.44 m³
  3. 1.44 m³ × 1.8 t/m³ = 2.59 tonnes (2,592 kg)
  4. 2,592 kg ÷ 25 kg per bag = 103.7, rounded up to 104 bags
Typical weights of common materials
Materialt/m³tons/yd³lb/ft³
Concrete2.402.02150
Gravel1.601.35100
Pea gravel1.601.35100
Crushed stone / crushed rock1.601.35100
River rock1.501.2694
Landscape rock / pebbles1.501.2694
Crushed limestone1.601.35100
Decomposed granite1.501.2694
Crusher run1.601.35100
Road base1.701.43106
Crusher dust1.501.2694
Aggregate (20 mm)1.601.35100
All-in ballast1.651.39103
MOT Type 1 sub-base1.801.52112
Sand1.601.35100
Topsoil1.301.1081
Garden soil1.301.1081
Fill dirt1.401.1887
Mulch0.350.2922
Bark chippings0.300.2519
Asphalt (compacted)2.321.96145

Loose, as-delivered figures; asphalt and concrete are as laid. Moisture, stone size and source change the real weight, so use your supplier's figure when you have it. Tons are US short tons (2,000 lb).

Common use cases

  • A sub-base for a patio or paving slabs
  • A driveway base for block paving or tarmac
  • A firm, level base for a shed or garden building
  • Paths and hard standing

How to use

  1. Choose feet and inches or metres and millimetres, and the country whose bag sizes you want.
  2. Enter the length and width of the area, or switch the shape to a circle, triangle or a known area. Use Add another area for L-shapes and separate beds.
  3. Enter the depth of Type 1. Enter the compacted depth: commonly 100 mm for patios and paths, 150 mm or more for driveways.
  4. Check the density and the extra allowance. Change the density if your supplier quotes a different figure.
  5. Read the volume, weight and bag count, and add a price per ton, cubic yard, m³ or bag for a cost estimate.

FAQ

How much Type 1 do I need for a patio?

A 4 × 3 m patio with 100 mm of compacted Type 1 needs 1.2 m³ finished. With 20% extra at 1.8 tonnes per m³ loose, that's about 2.6 tonnes: just over three 850 kg bulk bags, so order four.

How deep should Type 1 be?

About 100 mm compacted for patios and paths, and 150 mm or more for driveways, more on soft or clay ground. Lay and compact it in layers with a plate compactor rather than all at once.

How much does a tonne of Type 1 cover?

About 4.5 m² at 100 mm compacted, or about 3 m² at 150 mm, using this calculator's figures. An 850 kg bulk bag covers about 4 m² at 100 mm.

What's the difference between Type 1, Type 3 and scalpings?

Type 1 has fines and compacts into a dense, strong layer. Type 3 has fewer fines so water drains through it, which suits permeable paving. Scalpings are a cheaper, less consistent mix of stone and soil, often used for tracks and under less demanding surfaces.